McIntosh Power Plant Site Stormwater Modifications

Bidders ID: NBD23634889649366852
Due Date: Jul 13, 2026
Posted Date: Jun 8, 2026
Level of Government: State & Local
State: Florida
Agency: City of Lakeland
Category:
  • 49 - Maintenance and Repair Shop Equipment
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Z - Maintenance, Repair or Alteration of Real Property
Source: Members Only


Project ID:

Title: McIntosh Power Plant Site Stormwater Modifications

Addenda: 1

Release Date: 5/20/2026

Due Date: 7/13/2026

Follow
McIntosh Power Plant Site Stormwater Modifications
Last updated by Addendum #1 on Jun 9, 2026 3:26 AM
Request For Proposal
LE - Engineering
Project ID: 2026-RFP-049
Release Date: Wednesday, May 20, 2026
ยท Due Date: Monday, July 13, 2026 4:00pm
Posted Wednesday, May 20, 2026 9:00am
All dates & times in Eastern Time
Draft Response Events RSVP No Bid34 days, 18 hours, 26 minutes


Post Information

Posted At:Wed, May 20, 2026 9:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The purpose of this project is for modifications and removal of existing site conditions and construction of a new storm water management system McIntosh Power Plant. The project includes removal of pavement and infrastructure, site grading, and construction of two new stormwater retention ponds for areas that previously held Units 1, 2, and 3 and the Coal Yard at the McIntosh Power Plant. These two ponds are referred to as the "West Pond" and "Admin Pond" for the purposes of this project. Existing surface waters ponds within the project area will be altered, new outfalls will be installed, and riprap revetments will be installed to ensure no scouring or erosion will occur.



Background

The McIntosh Power Plant and associated facilities are located on a 530-acre property at 3030 East Lake Parker Drive in Lakeland, Polk County, Florida. The MPP facility has generation capacity consisting of multiple units including two diesel peaking units, two simple cycle combustion turbines, six reciprocating engines and a combined cycle natural gas unit (Unit No. 5). The southern section of the facility previously held additional generating unit (units 1, 2, and 3) which have since been retired and demolished. The overall stormwater management system subsequently requires significant modification as a result of these changes, not all of which are covered by this project. For the first phase of this project an Environmental Resource Permit was obtained to build two new stormwater retention ponds. The construction of these ponds and their associated features are the scope of this project.

  • The project will be delivered under a lump sum pricing structure for the West and Admin Pond
  • Attachment N Bid Pricing Sheet Stormwater Pond Construction



Timeline

RFP release:
May 20, 2026
Pre-Proposal Meeting (Mandatory):
May 27, 2026, 2:00pm
McIntosh Power Plant 3400 E Lake Parker Drive, Lakeland, FL, 33805. Entry is through gate 8. Meeting will be held on the 3rd floor of the white control room building (Unit 5 Conference room) on the right after entry through gate 8.
RFP questions deadline:
June 22, 2026, 5:00pm
RFP proposal due date:
July 13, 2026, 4:00pm
Disclaimer: The details regarding bids, requests for proposals (RFPs), and requests for qualifications (RFQs) on this site are provided for convenience and do not represent official public notice. To respond to or inquire about bids, RFPs, or RFQs, please contact the appropriate government department.

TRY FOR FREE

Not a GovernmentBidders Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >