Demolition of the Old Unit #1/#2 Breeching duct at IRP
| Bidders ID: | NBD21972331042957516 |
|---|---|
| Due Date: | Oct 15, 2026 |
| Posted Date: | Oct 6, 2026 |
| Level of Government: | State & Local |
| State: | Florida |
| Agency: | Orlando Utilities Commission |
| Category: |
|
| Solicitation Number: | PR9469 |
| Source: | Members Only |
Main
Agency
Orlando Utilities Commission
Orlando Utilities Commission
Status
Active
Active
Fiscal Year
2026
2026
Title
Demolition of the Old Unit #1/#2 Breeching duct at IRP
Demolition of the Old Unit #1/#2 Breeching duct at IRP
Type
Announcement
Announcement
Department
Online Submissions
Yes
Yes
Project Estimate
Piggyback Solicitation
No
No
Insurance Required
No
No
Bid Bond Required
No
No
Bid Bond Amount
Performance Bond Required
No
No
Performance Bond Amount
Construction Bond Required
No
No
Construction Bond Amount
Scope of Services
Provide a proposal to demolish and remove from site the deteriorated breeching duct from Flange to Flange. Bidders are encouraged to attend the site-visit and bring subcontractors as needed. The Contractor shall provide an all-inclusive price for providing the work Scope including the crane rental, rigging, scaffolding, and disposal.
Provide a proposal to demolish and remove from site the deteriorated breeching duct from Flange to Flange. Bidders are encouraged to attend the site-visit and bring subcontractors as needed. The Contractor shall provide an all-inclusive price for providing the work Scope including the crane rental, rigging, scaffolding, and disposal.
Dates(All times are listed as
EST
)
Broadcast Date
9/9/2026 4:00 PM EST
9/9/2026 4:00 PM EST
Question End Date
9/23/2026 5:00 PM EST
9/23/2026 5:00 PM EST
Sample Due Date
Due Date
10/15/2026 2:00 PM EST
10/15/2026 2:00 PM EST
Bid Opening Date
Question End Date Reminder Notification
1 Day(s)
1 Day(s)
Sample Due Date Reminder Notification
0 Day(s)
0 Day(s)
Due Date Reminder Notification
0 Day(s)
0 Day(s)
Pre-Bid Meetings
Total: 2
(All times are listed as
EST
)
| Date | Time | Mandatory | Location |
| 9/16/2026 | 9:00 AM | No |
Orlando Utilities Commission
Indian River Plant 7800 US Route 1 Titusville, FL 32780 |
| 9/30/2026 | 10:00 AM | No | Orlando Utilities Commission Indian River Plant 7800 US Route 1 Titusville, FL 32780 |
Shortlist Meeting
Total: 0
(All times are listed as
EST
)
| Date | Time | Location |
Documents
Total: 7
Quote/Bid
Quote/Bid Items
Additional Quote/Bid Items Fields
Quote/Bid Items
Total: 0
| # | Required | Group | Make | Model | Description | Quantity | Unit of Measure | Price/ Percent | Type |
Delivery Date
None
None
Required Files to be Uploaded by the Vendor
Quote
Quote
Shipping
None
None
Terms and Conditions
See OUC`s Terms and Conditions
See OUC`s Terms and Conditions
Include Shipping in Price of Items
Yes
Yes
Display Bid Tabulation to Vendors
No
No
Display Vendor Submissions to Vendors
No
No
View Vendor Submissions while Bid Solicitation is Active
No
No
Allow Options File to be Updated after Due Date
No
No
Allow Post Due Date Submission
No
No
Questions & Answers
Total: 16
| Question | Date Asked | Answer | Date Answered |
|
Good morning:
Spec. ST18A and 98105-SK6 are listed in the RFP as part of the drawing transmittal; however, they are not available for download on VendorLink. Would you please provide those documents? |
9/10/2026 8:39:26 AM | ||
| Hello: What`s the budget/ EOR for this project? | 9/10/2026 10:57:34 AM | ||
|
PR9469 — Clarification Request: Demolition Limits, Unit 1 Details, Plant Constraints, and Commercial Requirements
OUC Buyer of Record / PR9469 Team: Please provide the following clarifications for RFQ PR 9469, Demolition of Unit 1 and 2 Breeching Duct at Indian River Plant. 1. Demolition limits Please confirm whether the required demolition is limited to the cutlines identified in the RFQ photographs, including the stack flange cutlines, lower duct cutline, cutline north of the northernmost secondary dampers, Fig. 10 lower-duct segment, and stack access platform removal; or whether the scope includes the full Unit 1 and Unit 2 breeching assemblies shown on Drawings B-2, B-3, and M-900. If possible, please identify the exact start and end flanges/cutlines on the applicable drawings. 2. Unit 1 geometry / details Please provide available Unit 1 fabrication or detail drawings for the breeching included in the demolition scope. If no additional drawings are available, please confirm the applicable Unit 1 geometry/details to be used for takeoff and demolition planning. 3. Plant, outage, and crane constraints Please provide any project-specific requirements or restrictions related to: LOTO and/or required outage conditions crane setup and approved laydown areas boom, radius, or pick-path restrictions site access and escort requirements owner-required work windows or blackout periods 4. Commercial requirements VendorLink currently indicates Bid Bond: No, Performance Bond: No, Construction Bond: No, and Insurance Required: No, while the RFQ references the General Conditions for Services and insurance certificates at award. For PR9469 specifically, please confirm: whether a performance bond and/or payment bond is required the governing insurance requirements and limits for this work whether pollution liability coverage is required whether liquidated damages apply, and if so, the amount/basis whether retainage applies, and if so, the percentage Thank you for your assistance. Respectfully, Company Name: Breacher Demolition LLC Authorized Contact Name: Steven Pizarro Phone: (407) 791-4756 Email: breacherdemolition@gmail.com |
9/17/2026 1:28:27 AM | ||
| After the site visit, it was indicated that there is additional conduit that needs to remain not indicated on the original ITB. Please confirm what conduits and wire connecting the stack and building need to remain | 9/17/2026 10:36:06 AM | ||
|
While on the site visit, it was requested to install a blanking plate onto the ductwork. What specifications for steel, attachment specification to ductwork to remain, and locations required for these plates
|
9/17/2026 10:38:19 AM | ||
|
It was noted on the site visit that there is underground vaults, conduits, and other underground utilities. Is there any as builts to show where these are? What is the maximum ground pressure that can be placed in these areas?
|
9/17/2026 10:40:06 AM | ||
| Scaffolding may be used for personnel work platforms, is there any restriction on installing the scaffolding under and around the duct as well as attaching to the building or installing concrete anchors into the stack for stabilization of the scaffolding? | 9/17/2026 10:44:00 AM | ||
|
When is this project anticipated to be completed, Q1 of 2027? Outside hurricane season?
|
9/17/2026 10:45:02 AM | ||
| Are there any badging, or other access requirements for the site? | 9/17/2026 10:45:28 AM | ||
| It was shared that the insulation in the ductwork is non asbestos containing material. Can the ACM survey be provided? Have any other materials been tested? Should we price this project based on no ACM or other hazmat materials will be encountered? | 9/17/2026 10:47:17 AM | ||
| The Sworn Statement and Dispute Disclosure along with the Terms and Conditions are to be acknowledged, however the links are not working on the document. Can you please provide these documents for review? | 9/18/2026 10:34:37 AM | ||
| Existing Stack Access Platform: Please confirm whether the existing stack access platform adjacent to the Unit 1 breeching is to be removed or remain in place. If it is to remain, please clarify the required support condition after demolition, as the existing platform is currently supported by/connected to the breeching scheduled for removal. | 9/22/2026 9:40:10 AM | ||
| Platform Support / RC Stack Anchorage: If a new permanent support system is required for the existing platform, please confirm whether post-installed anchors into the existing reinforced-concrete stack are permitted. Please provide available structural information for the stack at the platform elevation. | 9/22/2026 9:40:31 AM | ||
| Unit 1 Building-Side Cutline: Figure 8 states that the Unit 1 duct cutline shall be on the north side of the secondary (northernmost) set of dampers. Please confirm the exact cut location: immediately north of the damper assembly, or north of the adjacent existing duct support. | 9/22/2026 9:40:53 AM | ||
|
In preparation of our proposal for RFQ PR 9469 – Demolition of Unit 1 and 2 Breeching Duct at Indian River Plant, we would like to request an additional site walk prior to the bid due date.
After further review of the provided drawings, photographs, and project scope, we would like the opportunity to perform a more detailed field review of the breeching duct and surrounding work areas. The additional walk would allow us to verify existing conditions and further evaluate access, crane setup locations and working radii, rigging and pick locations, scaffolding requirements, demolition sequencing, material handling, and laydown/loading areas. We would also like to take additional field measurements and photographs as necessary to assist with developing our demolition plan and accurately pricing the work. |
9/22/2026 9:51:08 AM | ||
|
In preparation of our proposal for RFQ PR 9469 – Demolition of Unit 1 and 2 Breeching Duct at Indian River Plant, we would like to request an additional site visit during the week of September 28, 2026, to further evaluate existing conditions, gather additional technical information, and accurately price the work.
To allow sufficient time to incorporate the information gathered during the site visit into our proposal, we respectfully request a one-week extension of the current bid due date. Please confirm whether the additional site visit and bid extension can be accommodated. |
9/22/2026 5:25:00 PM |
Commodity Codes
Total: 1
| Code | Description |
| [912-40] | Demolition Services |
Publications
Total: 0
| Publication | Date |
Disclaimer: The details regarding bids, requests for proposals (RFPs), and requests for qualifications (RFQs) on this site are provided for convenience and do not represent official public notice. To respond to or inquire about bids, RFPs, or RFQs, please contact the appropriate government department.
TRY FOR FREE
Not a GovernmentBidders Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.
