St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue, resurfacing, curb ramp upgrades, and traffic signal improvements
| Bidders ID: | NBD14614568656853162 |
|---|---|
| Due Date: | Jun 3, 2026 |
| Posted Date: | Jun 1, 2026 |
| Level of Government: | State & Local |
| State: | Missouri |
| Agency: | Missouri Department of Transportation(MDOT) |
| Category: |
|
| Source: | Members Only |
| Status | Bid Advertisement | Post Date | Revision Date | Letting Date |
| NEW | St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue, resurfacing, curb ramp upgrades, and traffic signal improvements | 5/4/26 | 6/3/26 | |
| Addendum 1 | St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue, resurfacing, curb ramp upgrades, and traffic signal improvements Addendum 1 | 6/1/26 | 6/3/26 | |
| Addendum 2 | St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue, resurfacing, curb ramp upgrades, and traffic signal improvements Addendum 2 | 6/1/26 | 6/3/26 |
Attachment Preview
NOTICE TO CONTRACTORS
Sealed bids for the Hanley Road – Laclede Station Road Resurfacing project will be received electronically
thru the County’s Vendor Self Service portal at:
https://stlouiscountymovendors.munisselfservice.com/Vendors/default.aspx until 2:00 p.m. on June 3, 2026
and at that time will be opened and read. Vendors may view the bid opening at
https://teams.microsoft.com/l/meetup-
join/19%3ameeting_N2Y4OGNjNWItYWFiMi00ZDhlLTg1ODQtZTRiMDgzMjYyZTU1%40thread.v2/0?context
=%7b%22Tid%22%3a%225102876d-b686-4f35-9dca-
09ae7168aa1a%22%2c%22Oid%22%3a%22d0c220d2-0c9f-44e3-bcfe-f28a362e83db%22%7d
Meeting ID: 237 992 395 167
Passcode: 3jg3eK3x
Dial in by phone: 1-872-256-4170, Phone conference ID: 636 115 662
St. Louis County Project No. AR-1819, Federal Project No. STP-5613(610) consists of removal and
replacement of deteriorated and/or damaged pavement and curbs, surfacing and texturing, asphaltic concrete
overlay, removal and replacement of sidewalk and curb ramps, signal improvements including installation of
accessible pedestrian signals, and other incidental items along Hanley Road-Laclede Station Road from
Manchester Road to Newport Avenue.
The successful Bidder or Bidders shall be required to comply with the most current applicable Federal (Davis-
Bacon Act) and State statutory provisions concerning the payment of prevailing wages on public works, Section
290.210 through 290.340 R.S. Mo. 1959, as amended. All contractors must be on the Missouri Department of
Transportation’s approved contractor listing, seven (7) days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on a public works project shall provide a ten (10)
hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial
Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the
construction project.
St. Louis County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into
pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged
individuals will be afforded full opportunity to submit bids in response to this invitation and will not be
discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in
consideration for an award.
Plans and specifications will be available on May 4, 2026 from the St. Louis County Web Site
(www.stlouiscountymo.gov), or by contacting Cross Rhodes Print & Technologies, 2731 South Jefferson
Avenue, St. Louis, Missouri 63118, (314) 678-0087. There will be no refunds on any documents purchased.
All questions must be submitted by 5:00 p.m. on May 27, 2026 via e-mail to the Contract Administrator,
Jill Allen, JAllen@stlouiscountymo.gov.
Select the following link to view/purchase plans and specifications for this project:
http://www.stlouiscoplans.com
Bids must be accompanied by a certified check or bidder's bond in an amount equal to 5% of the total bid. All
checks shall be made payable to "Treasurer, St. Louis County."
The right is reserved by the St. Louis County to reject any or all bids.
The DBE Goal for this project is 0%
No 2nd tier subcontracting will be allowed on this project.
DIRECTOR OF PROCUREMENT
ST. LOUIS COUNTY
You are viewing the opportunity summary page, which includes a brief overview and a preview of the attached documents.
Disclaimer: The details regarding bids, requests for proposals (RFPs), and requests for qualifications (RFQs) on this site are provided for convenience and do not represent official public notice. To respond to or inquire about bids, RFPs, or RFQs, please contact the appropriate government department.
TRY FOR FREE
Not a GovernmentBidders Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.
