| Bidders ID: |
NBD14153869023327219 |
| Due Date: |
Oct 13, 2026 |
| Posted Date: |
Oct 5, 2026 |
| Level of Government: |
State & Local |
| State: |
Maryland |
| Agency: |
State Government of Maryland |
| Category: |
- 60 - Fiber Optics Materials and Components, Assemblies and Access.
- 62 - Lighting Fixtures and Lamps
|
| Solicitation Number: |
BPM058041 |
| Source: |
Members Only |
|
ID:
|
BPM058041
|
|
Title:
|
Light Rail CBD Fiber Replacement
|
|
Status:
|
Open
|
|
Due / Close Date:
|
10/13/2026
|
|
Publish Date:
|
10/5/2026 9:25:05 AM
|
|
Main Category:
|
FIBER OPTIC CABLE
|
|
Solicitation Type:
|
IFB: Invitation for Bid
|
|
Issuing Agency:
|
Maryland Transit Administration
|
Title
Light Rail CBD Fiber Replacement
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Issuing Agency
Maryland Transit Administration
|
|
|
|
|
|
Procurement Officer / Buyer
|
Email
EReddick@mdot.state.md.us
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Solicitation Summary
This Contract is for the construction of pathways and fiber optic cable from Hamburg Station to the North Avenue Maintenance Facility, to create communications system connectivity and between locations of
instrument houses, traction power substations, station equipment cabinets and other facilities with the Operations Control Center (OCC).
Currently there is an existing 84 strand fiber optic cable connecting all the locations. This cable has reached its end of life and a new cable must be installed to maintain this connection. There is an existing 144 strand fiber optic cable installed aerially on the catenaries. It shall be the responsibility of the Contractor to splice into the 144 strand cable with drop cables, install the drop cables through pathways to the locations, terminate the strands, and test end to end strand. The existing fiber optic cable shall remain in place and remain in use by MTA as a backup to the new cable. Reconfiguration of the existing fiber and equipment is not part of this Contract.
|
|
|
Additional Instructions
|
|
Project Cost Class
D - $1,000,000 to $2,500,000
|
|
Pre-Bid Conference Information
|
Pre-Bid Conference Date (EST)
|
Pre-Bid Conference Details
|
|
|
|
|
|
|
|
|
|
Small Business Reserve Designation
|
|
|
|
|
Procurement Program Participation Goals
|
|
VSBE Participation (%)
|
|
MBE Participation (%)
|
|
African American MBE Participation (%)
|
|
Asian American MBE Participation (%)
|
|
Hispanic American MBE Participation (%)
|
|
Women-Owned MBE Participation (%)
|
|
DBE Participation (%)
|
|
SBE Participation (%)
|
|
|
|
|
|
|
|
Socio Economic Participation Criteria
|
|
Procurement Officer / Buyer
|
|
Alternate Link
|
|
|
|
Title
|
Type
|
Att.
|
Last Modified on UTC-4
|
Creation Date UTC-4
|
Validity End Date
|
|
|
T-1466-0140R- Addendum No. 4
|
Amendment (Approved)
|
|
10/5/2026 9:24:10 AM
|
10/5/2026 9:24:10 AM
|
|
|
|
T-1466-0140R- Addendum No. 3
|
Amendment (Approved)
|
|
|
9/21/2026 9:31:09 AM
|
|
|
|
T-1466-0140R- Addendum No. 2
|
Amendment (Approved)
|
|
|
9/4/2026 12:21:21 PM
|
|
|
|
T-1466-0140R- Addendum No.1
|
Amendment (Approved)
|
|
|
8/19/2026 1:58:28 PM
|
|
|
|
T-1466-0140R LIGHT RAIL CBD FIBER REPLACEMENT FINAL ADVERTISEMENT
|
Specification Document (Approved)
|
|
|
7/20/2026 4:39:35 PM
|
|
|
|
{DGS Mandatory Document} 1% Administration Fee
|
Attachments & Appendixes (Approved)
|
|
|
2/6/2026 11:08:02 AM
|
|
|
|
Disclaimer: The details regarding bids, requests for proposals (RFPs), and requests for qualifications (RFQs) on this site are provided for convenience and do not represent official public notice. To respond to or inquire about bids, RFPs, or RFQs, please contact the appropriate government department.
TRY FOR FREE
Not a GovernmentBidders Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.
Start Free Trial Today >