Mine Creek Sanitary Sewer Improvements

Bidders ID: NBD12271492061867994
Due Date: Jan 14, 2027
Posted Date: Nov 18, 2026
Level of Government: State & Local
State: North Carolina
Agency: State Government of North Carolina
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation Number: 274-WS-2018-30 (2026)
Source: Members Only
Solicitation Number: 274-WS-2018-30 (2026)
Project Title: Mine Creek Sanitary Sewer Improvements
Description: Mine Creek Sanitary Sewer Improvements: Installation of approximately 15,500 LF of replacement 24-inch, 36-inch, and 42-inch gravity sewer and associated replacement concrete and polymer concrete manholes • Installation of approximately 13,000 LF of CIPP structural liner in existing of 24-inch, 30- inch, 36-inch gravity sewer and epoxy lining of associated existing manholes • Trenchless installation of 36-inch gravity sewer through the Shelley Lake Auxiliary Spillway • Abandonment of the existing 24-inch gravity sewer through Shelley Lake Dam • Installation of two pre-cast junction structures to maintain adequate flow splits in the Mine Creek sanitary sewer system • Installation of approximately 1,720 LF of stream stabilization measures • Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements
Opening Date: 1/14/2027 2:00 PM
Posted Date: 11/18/2026
Status: Open
Department: CITY OF RALEIGH
Solicitation Number
*
274-WS-2018-30 (2026)
Department
CITY OF RALEIGH
Status Reason
Open
Opening Date
2027-01-14T14:00:00.0000000
Posted Date
*
2026-11-18T13:08:39.0000000Z
Primary Commodity Code
Construction Services
Mandatory Conference/Site Visit
2026-12-08T05:00:00.0000000Z
Special Instructions
Bid Agent: todd.toler@raleighnc.gov
Solicitation Type
*
IFB
Owner
Lanee Edwards
Description
Mine Creek Sanitary Sewer Improvements: Installation of approximately 15,500 LF of replacement 24-inch, 36-inch, and 42-inch gravity sewer and associated replacement concrete and polymer concrete manholes • Installation of approximately 13,000 LF of CIPP structural liner in existing of 24-inch, 30- inch, 36-inch gravity sewer and epoxy lining of associated existing manholes • Trenchless installation of 36-inch gravity sewer through the Shelley Lake Auxiliary Spillway • Abandonment of the existing 24-inch gravity sewer through Shelley Lake Dam • Installation of two pre-cast junction structures to maintain adequate flow splits in the Mine Creek sanitary sewer system • Installation of approximately 1,720 LF of stream stabilization measures • Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements

Attachment Preview

You are viewing the opportunity summary page, which includes a brief overview and a preview of the attached documents.
Disclaimer: The details regarding bids, requests for proposals (RFPs), and requests for qualifications (RFQs) on this site are provided for convenience and do not represent official public notice. To respond to or inquire about bids, RFPs, or RFQs, please contact the appropriate government department.

TRY FOR FREE

Not a GovernmentBidders Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >