Chiller Replacement Roybal Campus
| Bidders ID: | NBD00159987979741531 |
|---|---|
| Due Date: | May 8, 2026 |
| Posted Date: | Apr 23, 2026 |
| Level of Government: | Federal |
| State: | Georgia |
| Agency: | HEALTH AND HUMAN SERVICES, DEPARTMENT OF |
| Category: |
|
| Solicitation Number: | 75D301-26-R-73398 |
| Source: | Members Only |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Apr 23, 2026 04:30 pm EDT
- Original Response Date: May 08, 2026 05:00 pm EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: May 23, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2AA - REPAIR OR ALTERATION OF OFFICE BUILDINGS
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
GA 30329USA
This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility.
a. Provide all design, engineering, management, supervision, labor, materials, equipment, testing, commissioning, training, and closeout services required to modernize the B10 chilled-water plant.
b. Replace four existing 1,450-ton chillers with new 1,800-ton chillers and provide associated starters, controls, piping, isolation valves, refrigerant monitoring, and appurtenances.
c. Replace nine existing cooling tower cells with eight new cells; provide structural modifications, walkways, maintenance access, valves, piping, and roofing work required for the new configuration.
d. Replace primary chilled-water pumps, condenser-water pumps, associated starters / VFDs, and modify chilled-water and condenser-water piping as required for the new plant arrangement.
e. Perform associated medium-voltage and low-voltage electrical upgrades, BAS / controls integration, structural work, fire protection modifications, and ancillary systems work identified in Attachment A.
f. Provide phased execution that preserves campus operations; no more than two chillers may be removed from service at one time.
- 1600 CLIFTON ROAD
- ATLANTA , GA 30333
- USA
- Simi Khera
- Hkhera@cdc.gov
- Apr 23, 2026 04:30 pm EDTPresolicitation (Original)
Related Document
| Feb 4, 2026 | [Sources Sought (Original)] Chiller Replacement Roybal Campus |
| Apr 23, 2026 | [Combined Synopsis/Solicitation (Original)] Chiller Replacement Roybal Campus |
| May 11, 2026 | [Solicitation (Original)] Chiller Replacement Roybal Campus |
| May 27, 2026 | [Solicitation (Updated)] Chiller Replacement Roybal Campus |
| Jun 3, 2026 | [Solicitation (Updated)] Chiller Replacement Roybal Campus |
| Jun 8, 2026 | [Solicitation (Updated)] Chiller Replacement Roybal Campus |
TRY FOR FREE
Not a GovernmentBidders Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.