Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
| Bidders ID: | NBD00159966077350977 |
|---|---|
| Due Date: | Sep 18, 2026 |
| Posted Date: | Aug 19, 2026 |
| Level of Government: | Federal |
| State: | Oregon |
| Agency: | DEPT OF DEFENSE |
| Category: |
|
| Solicitation Number: | W9127N26BA024 |
| Source: | Members Only |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Aug 19, 2026 03:30 pm PDT
- Original Date Offers Due: Sep 18, 2026 03:00 pm PDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Oct 03, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Cascade Locks , OR 97014USA
The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge.
The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34’4½” out-to-out, with two 11’0” travel lanes, two 2’0” shoulders, a 5’0” sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In
addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.
- KO CONTRACTING DIVISION 333 SW FIRST AVE
- PORTLAND , OR 97204-3495
- USA
- Christopher Burroughs
- christopher.d.burroughs@usace.army.mil
- Justin Figueredo
- Justin.F.Figueredo@usace.army.mil
- Aug 19, 2026 03:30 pm PDTSolicitation (Original)
- Aug 04, 2026 10:06 pm PDT Presolicitation (Original)
Related Document
| Jul 6, 2026 | [Presolicitation (Original)] Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement |
| Aug 27, 2026 | [Solicitation (Updated)] Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement |
| Aug 28, 2026 | [Solicitation (Updated)] Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement |
| Sep 3, 2026 | [Solicitation (Updated)] Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement |
| Sep 9, 2026 | [Solicitation (Updated)] Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement |
| Sep 19, 2026 | [Solicitation (Updated)] Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement |
| Sep 29, 2026 | [Solicitation (Updated)] Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement |
| Oct 1, 2026 | [Solicitation (Updated)] Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement |
| Oct 14, 2026 | [Solicitation (Updated)] Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement |
| Oct 20, 2026 | [Solicitation (Updated)] Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement |
TRY FOR FREE
Not a GovernmentBidders Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.