PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY WALLOPS, VA
| Bidders ID: | NBD00159288567798977 |
|---|---|
| Due Date: | Jun 4, 2026 |
| Posted Date: | May 23, 2026 |
| Level of Government: | Federal |
| State: | Virginia |
| Agency: | DEPT OF DEFENSE |
| Category: |
|
| Solicitation Number: | W912DY26RA086 |
| Source: | Members Only |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: May 22, 2026 01:05 pm CDT
- Original Date Offers Due: Jun 04, 2026 02:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Jun 19, 2026
-
Initiative:
- None
- Original Set Aside: SBA Certified Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside (FAR 19.15)
- Product Service Code: P400 - SALVAGE- DEMOLITION OF BUILDINGS
-
NAICS Code:
- 238910 - Site Preparation Contractors
-
Place of Performance:
Wallops Island , VAUSA
The objective of this Performance Work Statement is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB’s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.
- 300 SECURE GATEWAY KO CONTRACTING DIVISION
- REDSTONE ARSENAL , AL 35898-0000
- USA
- Tyrone M. Brown,
- Tyrone.M.Brown@usace.army.mil
- Christy N. Tallant
- Christy.N.Tallant@usace.army.mil
- May 22, 2026 01:05 pm CDTSolicitation (Original)
TRY FOR FREE
Not a GovernmentBidders Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.