Upgrade UPS & Cooling System
| Bidders ID: | NBD00159228035885858 |
|---|---|
| Due Date: | Jun 30, 2026 |
| Posted Date: | Jun 1, 2026 |
| Level of Government: | Federal |
| State: | Wyoming |
| Agency: | DEPT OF DEFENSE |
| Category: |
|
| Solicitation Number: | W50S8W-26-Q0001 |
| Source: | Members Only |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Jun 01, 2026 08:07 am MDT
- Original Date Offers Due: Jun 30, 2026 10:00 am MDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Jul 15, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 6150 - MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT
-
NAICS Code:
- 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing
-
Place of Performance:
Cheyenne , WY 82009USA
The vendor shall provide un-installation of outdated equipment
and installation of brand-new items according to acceptable standards. Contractor
shall provide Uninterruptible Power and Cooling Distribution Unit replacement/
installation and a Site Lead/Project Manager to provide the following critical tasks to
support to the WYANG per the PWS.
• 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid.
• 5.3.4 Demo existing piping
• 5.3.5 Run new Pex piping to the in-row coolers.
• 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure.
Tie existing EPO into new Shunt Trip breaker.
• 5.3.7 Existing 3” Feeder conduit & wire fed from MDP will be shutdown &
locked out. Intercept existing Feeder to line side of new 350A Shunt Trip
Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt
Trip Breaker to new UPS.
• 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old
UPS.
• 5.3.9 Install Power Modules and Battery Cabinets
• 5.3.10 Assume the existing structural integrity of raised floor is sufficient to
move old UPS across floor & new UPS installed at old UPS location. All
raised floor modifications by others.
SITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED.
QUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT
- KO FOR WYANG DO NOT DELETE 217 DELL RANGE BLVD
- CHEYENNE , WY 82009-4799
- USA
- Kristopher W Kahle
- kristopher.kahle@us.af.mil
- Phone Number 307-772-6887
- Jun 01, 2026 08:07 am MDTCombined Synopsis/Solicitation (Original)
TRY FOR FREE
Not a GovernmentBidders Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.