Argon Piping Supply, Installation and Testing

Bidders ID: NBD00159046929121019
Due Date: Jul 27, 2026
Posted Date: Jun 2, 2026
Level of Government: Federal
State: South Dakota
Agency: ENERGY, DEPARTMENT OF
Category:
  • Y - Construction of Structures and Facilities
Solicitation Number: 73573
Source: Members Only
Follow
Argon Piping Supply, Installation and Testing
Active
Contract Opportunity
Notice ID
73573
Related Notice
Department/Ind. Agency
ENERGY, DEPARTMENT OF
Sub-tier
ENERGY, DEPARTMENT OF
Office
FERMILAB - DOE CONTRACTOR
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: Jun 02, 2026 02:40 pm MDT
  • Original Date Offers Due: Jul 27, 2026 05:00 pm MDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Aug 11, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: No Set aside used
  • Product Service Code: Y1JZ - CONSTRUCTION OF MISCELLANEOUS BUILDINGS
  • NAICS Code:
    • 236210 - Industrial Building Construction
  • Place of Performance:
    Lead , SD 57754
    USA
Description

As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC.



This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.




Attachments/Links
Contact Information
Contracting Office Address
  • Kirk Rd. & Pine St.
  • Batavia , IL 60510
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Jun 02, 2026 02:40 pm MDTSolicitation (Original)
Disclaimer: The details regarding bids, requests for proposals (RFPs), and requests for qualifications (RFQs) on this site are provided for convenience and do not represent official public notice. To respond to or inquire about bids, RFPs, or RFQs, please contact the appropriate government department.

TRY FOR FREE

Not a GovernmentBidders Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >