Fort Lee Vehicle Recovery Range
| Bidders ID: | NBD00159007972330460 |
|---|---|
| Due Date: | Sep 1, 2026 |
| Posted Date: | Aug 4, 2026 |
| Level of Government: | Federal |
| State: | Virginia |
| Agency: | DEPT OF DEFENSE |
| Category: |
|
| Solicitation Number: | W9123626BA006 |
| Source: | Members Only |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Aug 04, 2026 01:51 pm EDT
- Original Published Date: Jun 18, 2026 04:30 pm EDT
- Updated Date Offers Due: Sep 01, 2026 02:00 pm EDT
- Original Date Offers Due: Jul 28, 2026 02:00 pm EDT
- Inactive Policy: Manual
- Updated Inactive Date: Aug 04, 2027
- Original Inactive Date: Aug 12, 2026
-
Initiative:
- None
- Original Set Aside: 8(a) Set-Aside (FAR 19.8)
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Fort Lee , VAUSA
Amendment 0004: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0004, extending the bid due date and bid opening date.
The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
- KO CONTRACTING OFFICE 803 FRONT STREET
- NORFOLK , VA 23510-1096
- USA
- Michael Stevenson
- michael.l.stevenson@usace.army.mil
- Phone Number (757) 201-7233
- Michael Hagerty
- michael.hagerty@usace.army.mil
- Phone Number (757) 201-7303
- Aug 04, 2026 01:51 pm EDTSolicitation (Updated)
- Jul 21, 2026 04:42 pm EDT Solicitation (Updated)
- Jul 17, 2026 03:33 pm EDT Solicitation (Updated)
- Jun 29, 2026 05:04 pm EDT Solicitation (Updated)
- Jun 18, 2026 04:30 pm EDT Solicitation (Original)
Related Document
| Dec 1, 2025 | [Presolicitation (Original)] Construction of a Vehicle Recovery Range at Fort Lee in Prince George County, VA |
| Jun 18, 2026 | [Solicitation (Original)] Fort Lee Vehicle Recovery Range construction project |
| Jun 29, 2026 | [Solicitation (Updated)] Fort Lee Vehicle Recovery Range |
| Jul 17, 2026 | [Solicitation (Updated)] Fort Lee Vehicle Recovery Range |
| Jul 21, 2026 | [Solicitation (Updated)] Fort Lee Vehicle Recovery Range |
| Aug 25, 2026 | [Solicitation (Updated)] Fort Lee Vehicle Recovery Range |
TRY FOR FREE
Not a GovernmentBidders Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.
