PROJECT DESCRIPTION
The Crisp County Board of Commissioners, (herein referred to as CCBOC), invites you a Building/Flooring
Contractor, (herein referred to as Contractor), to submit a bid for the removal of existing carpet tile and the
Installation of New Flooring(LVP) and cove base on the 1st and 2nd floor common areas (herein referred to
as New Flooring), at the Crisp County Courthouse. This bid must completely deliver, install, test,
commission, warrant and document the New Flooring. All times in this RFP are Eastern Daylight Time,
(herein referred to as EDT).
You may pick up a copy of the RFP at 210 S 7th St, Cordele GA, 31015, Rm 303, or by visiting the Crisp
County Web Site, http://www.crispcounty.com, clicking on the bid opportunities tab and downloading it from
there.
SCOPE OF WORK
•
Remove existing carpet tiles and cove base for installation of the New Flooring
•
Prepare exposed concrete, as needed, to accept the New Flooring.
•
Indicate any changes required to successfully install the New Flooring, if any.
•
All work to be performed on weekends only.
•
Replace the removed 4” cove base with 6” cove base.
•
Install, test, commission, warrant, and document this installation.
•
Provide any Operational Maintenance data to the CCBOC Maintenance Staff.
Bidders, by submitting a proposal understand that work may have to be performed outside of normal
business hours. (Normal business hours are 8:00 AM EDT until 5:00 pm EDT, Monday through Friday).
RFP SCHEDULE
•
Release of RFP
•
Pre-Bid Conference - Required
•
Bids Due
•
Award of Contract
•
Project Start Date
• Monday, DECEMBER 16, 2024
• Friday, JANUARY 3, 2025 10:00 AM EDT
Location: Crisp County Courthouse, 510 N 7th
Street, Cordele, GA. 31015
• Wednesday, JANUARY 15, 2025 2:00 PM EDT
• on or before Wednesday, JANUARY 22, 2025
• Saturday, FEBUARY 8, 2025 8:00 AM EDT
DELIVERABLES
Prior to Award:
•
Provide EMR rating of 1 or less.
•
Contractor’s Pricing for the New Flooring.
•
Submit completed, all attachments to this RFP.
•
Completed Bid Form must be broken into Material and Labor, separated.
•
Submit in Printed format, three (3) copies.
After Award:
•
Provide copies of Contractor’s Licenses and Insurance, within seven (7) days of award.
•
Remove existing carpet tiles from common areas (1st and 2nd floors).
•
Install new flooring in the common areas of 1st and 2nd floors.
•
Provide 1 Year Warranty Statement.
SELECTION CRITERIA
•
Quality of Work on Similar Projects
•
Ability to perform the project within the timeline requested
•
Project Cost
PREPARATION OF BID
•
Contractors are expected to thoroughly and completely examine and familiarize themselves with this
RFP.
•
Failure in any area of this RFP, to understand the content, will be at the Contractor’s risk.
•
Each Contractor shall furnish the information required by this RFP.
•
The Contractor shall sign the bid in the appropriate spaces.
•
Each Contractor by making a proposal represents that they have visited the site and familiarized
themselves with the local conditions under which the work is to be performed.
•
Each Contractor by making a proposal represents that they have read and understand the RFP
documents.
Completeness of Bid
•
All Contractors are cautioned to make the Bid complete and to furnish all required information and
details.
•
Your Bid Package must break cost into materials and labor.
•
Any changes to the RFP will be made in the form of an Addendum.
Contractor Questions
•
Any explanation desired by a Contractor regarding vague or not understood wording, meaning, or
Interpretation of any portion of this RFP may be made in writing to Toby Coleman via the contact
information at the end of this section.
•
Questions are due no later than 5:00 PM EDT, FRIDAY JANUARY 03, 2025.
•
Answers given to a Contractor concerning this RFP will be furnished to all qualified Contractors as an
addendum to this RFP.
•
Receipt of all addendum by a Contractor must be acknowledged on the bid.
•
Written instructions or explanations not bearing the signature of Toby Coleman, or oral instructions or
explanations given before the award of the bid contract, will not be binding on CCBOC.
Toby Coleman
210 S 7th St Rm 303, Cordele GA, 31015
toby.coleman@crispcounty.com
Fax 229-276-2675
Submission of Bid Package
Contractors are to submit their Proposal and Bid Documents to the following address prior to 2:00 PM EDT,
Wednesday JANUARY 15, 2025:
Crisp County Board of Commissioners
“New Flooring”
Attn: Clark Harrell
21O S. 7th St Rm 303
Cordele GA, 31015
ATTACHMENT A
New Flooring Proposal
Place: Crisp County Board of Commissioners
210 S 7th St
Cordele. GA 31015
Date: JANUARY 15. 2025
Time: 2:00 PM EDT
Proposal of _________________________________ DBA _______________________________________
(Hereinafter called Contractor) organized and existing under the laws of the State of
Georgia, as a
(corporation, partnership, individual)
To: The Crisp County Board of Commissioners (hereinafter called CCBOC).
Gentlemen:
The Contractor, in compliance with your invitation for proposals from qualified BUILDING/FLOORING
Contractor, knowing the site of the proposed work, and being familiar with all the conditions surrounding this
project, hereby submits the following proposal:
Contractor acknowledges the receipt of the following addendum (if any):
Contractor agrees to be prepared to commence work on requested tasks on SATURDAY, FEBUARY 8,
2025, 8:00 AM EDT.
Contractor agrees to perform all of the work described in the PROJECT DESCRIPTION, and the SCOPE OF
WORK provided herewith, as presented in the Request for Proposals as requested at the rates set forth
below:
Total Project Cost: $_________________________________
The Contractor provides the following estimates:
1. Cost of materials: _______________________
2. Cost of labor:
_______________________
The Contractor understands that compliance with all applicable Federal, State and Local Law, Rules and
Regulations is required.
ATTACHMENT A continued
New Flooring Proposal
The Contractor understands that he must comply with the Copeland “Anti-Kick Back” Act. This act
provides that each contractor shall be prohibited from inducing, by any means, any person employed in
the conduct of public work to give up any part of the compensation to which he is otherwise entitled.
The Contractor understands that he must provide Certification of Equal Opportunity Employer, Drug Free
Workplace, and D.B.E. Candidate or Minority Contractor status where applicable. D.B.E Contractors are
encouraged to participate.
The Contractor understands that he must comply with the Georgia Security and Immigration
Compliance Act:
1.
Contractor and any and all sub-contractors utilized in conjunction with services provided to local
government will comply with the requirements of O.C.G.A. § 13-10-91 and the Georgia Department of
Labor's Rule 300-101-.02.
2.
Contractor must indicate the appropriate blank: Contractor employs: __ 500 or more employees;
__ 100 to 499 employees; __ 99 or fewer employees.
3.
Contractor will provide a lawfully executed affidavit or substantially similar affidavit to the Georgia
Department of Labor's' Contractor Affidavit, as set forth in Rule 300-10-1-.07, to the local government
which will be a material term of the contract and incorporated into the contract.
4.
In the event that Contractor employs or contracts with any subcontractor(s) in conjunction with
this contract, Contractor will secure from each and every subcontractor a written representation of the
number of employees each subcontractor employs as being 500 or more employees, 100 to 499
employees or 99 or fewer employees.
5.
Contractor will provide lawfully executed affidavits or substantially similar affidavits from each and
every subcontractor utilized in conjunction with this agreement and will provide copies of those affidavits
to the local government. These subcontractor affidavits will be attached and incorporated into this
agreement. The subcontractor affidavit should be identical or substantially similar to the subcontractor
affidavit prepared by the Georgia Department of Labor at Rule 300-10-1-.08. This subcontractor affidavit
also must be or become a part of any agreement between' the Contractor and Subcontractor.
6.
Contractor and any subcontractor that provides services related to the contract understands and
acknowledges that it may be subject to audit by the Georgia Department of Labor for its compliance with
O.C.G.A. 13-10-90 et seq. and all implementing rules.
The Contractor agrees that this bid shall be valid and may not be withdrawn or revoked for a period of
sixty (60) calendar days after the scheduled bid opening time.
Respectfully submitted by:
______________________________________________________________________
Print Name
Signature
______________________________________________________________________
Title
______________________________________________________________________
Business address
(Seal-if Contractor is a corporation)
ATTACHMENT B
GSICA CONTRACTOR AFFIDAVIT AND AGREEMENT
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. 13-10-91,
stating affirmatively that the individual, firm, or corporation that is contracting with Crisp County Georgia
has registered with and is participating in a federal work authorization program* [any of the electronic
verification of work authorization programs operated by the United States Department of Homeland
Security or any equivalent federal work authorization program operated by the United States Department
of Homeland Security to verify information of newly hired employees, pursuant to the Immigration
Reform and Control Act of 1986 (IRCA), P.L. 99-603], in accordance with the applicability provisions and
deadlines established in O.C.G.A.13-10-91.
The undersigned further agrees that, should it employ or contract with any subcontractor(s) in connection
with the physical performance of services pursuant to this contract with Crisp County Georgia, contractor
will secure from such subcontractor(s) similar verification of compliance with O.C.G.A. 13-10-91 on the
Subcontractor Affidavit provided in Rule 300-10-01-.08 or a substantially similar form. Contractor further
agrees to maintain records of such compliance and provide a copy of each such verification to the County
Administrator of Crisp County Georgia at the time the subcontractor(s) is retained to perform such service.
Contractor must indicate the appropriate blank: Contractor employs _ 500 or more employees; __ 100 to
499 employees; __ 99 or fewer employees;
EEV / Basic Pilot Program* User Identification Number: ______________________
BY: Authorized Officer or Agent Signature: _________________________________________
Contractor Name: ____________________________________________________
Title of Authorized Officer or Agent of Contractor: ____________________________
Printed Name of Authorized Officer or Agent: _______________________________
Date: ___________________________
Subscribed and sworn before me on this the ____day of _____________________,20__.
Notary Public
My Commission Expires: _______________________________
* As of the effective date ofO.C.GA 13-10-91, the applicable federal work authorization program is the
"EEV {Basic Pilot Program" operated by the U. S. Citizenship and Immigration Services Bureau of the
U .8. Department of Homeland Security, in conjunction with the Social Security Administration (SSA).
(End of Form)
You are viewing the opportunity summary page, which includes a brief overview and a preview of the attached documents.
Disclaimer: The details regarding bids, requests for proposals (RFPs), and requests for qualifications (RFQs) on this site are provided for convenience and do not represent official public notice. To respond to or inquire about bids, RFPs, or RFQs, please contact the appropriate government department.
TRY FOR FREE
Not a GovernmentBidders Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.