673CS R1 NORTH UPS

Bidders ID: NBD00159018855901127
Due Date: Sep 6, 2024
Posted Date: Sep 4, 2024
Level of Government: Federal
State: Alaska
Agency: DEPT OF DEFENSE
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation Number: FA500024Q0055
Source: Members Only
Follow
673CS R1 NORTH UPS
Active
Contract Opportunity
Notice ID
FA500024Q0055
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Major Command
PACIFIC AIR FORCES
Office
FA5000 673 CONS LGC
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • All Dates/Times are: (UTC-08:00) ANCHORAGE, ALASKA, USA
  • Updated Published Date: Sep 03, 2024 03:24 pm AKDT
  • Original Published Date: Aug 15, 2024 09:39 am AKDT
  • Updated Date Offers Due: Sep 06, 2024 02:00 pm AKDT
  • Original Date Offers Due: Sep 06, 2024 02:00 pm AKDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Sep 21, 2024
  • Original Inactive Date: Sep 21, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J061 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT
  • NAICS Code:
    • 811210 - Electronic and Precision Equipment Repair and Maintenance
  • Place of Performance:
    JBER , AK 99505
    USA
Description View Changes

03 Sep 2024- Added Q&A for vendors to ba able to complete their quotes





20 Aug 24 - Added a wiring diagram and investigation report with battery information





The Government intends to Replace end-of-life batteries supporting R1 North ALMR site. R1 North provides line of sight communications capabilities to DOD and state agencies supporting JBER and Anchorage. Services supported include emergency services, base security, range control and base operations. Currently if power is lost services provided could be interrupted and equipment damaged.



The government intends to establish a firm-fixed price contract for the following:





The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and provide one time service of onsite Eltek Uninterruptible Power Supply (UPS). These services shall include any equipment, wiring, or infrastructure to ensure the Contractor's proposed solution is compatible with the Government's current infrastructure without additional Government expense. The Contractor shall follow all Federal Communications Commission (FCC), Public Utility Commission (PUC), Department of Defense (DoD), AF, and industry standards for this requirement.





1.2 SPECIFIC REQUIREMENTS: Listed below is a synopsis, please see PWS for full requirements





1. New Batteries

a. Remove and dispose of current batteries per EPA standards.

b. Provide and install 48 sealed VRLA batteries, utilizing proper torque values (where applicable).





2. Visually inspect conditions and appearance of the following:

a. Connection terminals inter cell/battery connectors, cables and associated hardware.

b. Cell/battery covers, containers, and post seals.

c. Battery racks or cabinets and associated components and hardware.

d. Cell/battery jar or cover, noting any excessive distortion.





3. Perform cleaning of all accessible surfaces as required.





4. Conduct the following Inspections:

a. Inspect all printed circuit board connections for cleanliness, swab contacts if necessary.

b. Inspect all power connections for signs of overheating

c. Inspect all subassemblies, bridges and legs for signs of component defects or stress

d. Inspect all DC capacitors for signs of leakage

e. Inspect all AC capacitors for signs of leakage

f. Inspect and inventory all customer-owned spare parts

g. Inspect for, and perform as required, any open engineering changes





5. Reporting of Battery Update Visit:

a. The technician(s) will issue the customer a report summarizing the work that was performed, condition of the battery and identifying any critical issues before leaving the customer's site.





6. A Field Activity Report containing observations, conditions, and recommendations will be sent to the customer within 5 business days. The field report shall consist of both manufacture and actual parameters for the following areas plus actual service performed:





a. Internal Operating Parameters

i. DC Ground Detection Offset (if applicable)

ii. Inverter leg current average balance (if applicable)

iii. Output filter current average phase balance

iv. Rectifier bridge current average leg balance

v. AC Protection settings are checked

vi. DC Protection settings are checked

vii. Input and Output Frequency and Voltage Bandwidth settings are checked

viii. Verify DC filter capacitance

ix. Verify AC tank and trap filter capacitance

x. Power Supply voltages and waveforms

xi. Update UPS firmware as necessary





b. External Operating Parameters

i. System Input Voltages (all phases)

ii. System Input Currents (all phases)

iii. DC Charging Voltages (float and equalize), record settings, adjust to nominal

iv. Rectifier phase on and walk up Scope of Work

v. Inverter phase on and walk up

vi. Adjust all panel meters to measured values

vii. System Bypass Voltages (all phases)

viii. Manual and UV Transfer Testing, verify uninterrupted transfer waveform (if applicable)





c. Outage simulation, and battery capability testing, and verify charger current limit. Environmental Parameters

i. UPS area ambient temperature and condition of ventilating equipment

ii. General Cleanliness of UPS Power Module

iii. General Cleanliness of UPS area

iv. Replace air filters as applicable and necessary (parts if required are included at no charge under service agreements with full parts coverage, otherwise billable)

v. Clean outside of UPS including control panel/CRT screen




Attachments/Links
Contact Information
Contracting Office Address
  • ADMIN ONLY NO REQTN CP 907 552 5614 10480 SIJAN AVE STE 242
  • JBER , AK 99506-2501
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Aug 15, 2024[Combined Synopsis/Solicitation (Original)] 673CS R1 NORTH UPS
Aug 21, 2024[Combined Synopsis/Solicitation (Updated)] 673CS R1 NORTH UPS
Disclaimer: The details regarding bids, requests for proposals (RFPs), and requests for qualifications (RFQs) on this site are provided for convenience and do not represent official public notice. To respond to or inquire about bids, RFPs, or RFQs, please contact the appropriate government department.

TRY FOR FREE

Not a GovernmentBidders Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >